IMPLEMENTATION

Anteproyecto
Blueprints
Blueprints or preliminary projects are based on conceptual studies and allow the Promoter to submit to the Competent Authority an Unsolicited Proposal (NSP) for an AUTOTREN project.
1
Anteproyecto
Blueprints
7
Feasibility Studies
Feasibility studies are professionally prepared by specialized Consultants hired by the Developer and/or the Government, include complete studies and are the basis for the project financing.
2
7
Feasibility Studies
3. Proyecto Ejecutivo
Executive Project
The Executive Project includes the preparation of technical specifications, engineering and plans related to the infrastructure, automation and rolling stock necessary for the implementation of the project.
3
3. Proyecto Ejecutivo
Executive Project
4. Integración Tecnológica
Technological Integration
Technological integration includes the construction of the infrastructure and the installation and commissioning of the equipment, the functional integration with the infrastructure.
4
4. Integración Tecnológica
Technological Integration
5. Acompañamiento de Obra
Work Accompaniment
The accompaniment and supervision services during the construction and supply stage to monitor the processes and verify the deliverables of the various suppliers.
5
5. Acompañamiento de Obra
Work Accompaniment
6. Operación piloto
Pilot Operation
The operation in the control center is carried out by Modutram personnel, who gradually train and hand over responsibility to the Operator's personnel.
The operation of the stations is carried out by personnel of the Operator under the supervision of leading personnel of Modutram.
The planned duration of this stage is usually 8 weeks, which may be extended by mutual agreement with the Operating Company and/or the Promoter.
6
6. Operación piloto
Pilot Operation

Implementation